Key stock is metal bar stock used to make machine keys for keyed shaft-and-hub connections. A finished key occupies matching grooves in the shaft and a mating component, such as a gear or pulley, so the connection can transmit torque. Buying the bar is only part of the decision: the finished key, shaft groove and hub groove must agree with the assembly drawing.
For an industrial purchase, begin with the component drawing and the required delivered condition. Establish whether the order is for a length of stock to be cut later, a cut blank requiring further work, or a finished shaft key ready for inspection. Those descriptions can lead to different quotations even when the nominal cross section appears identical.
Key stock describes the starting material; a finished machine key describes the part that must fit the assembly. Stock may have the required cross section while still needing a specified length, end shape, edge treatment or other finishing operation. Do not assume that a bar listed as key stock arrives as an installation-ready replacement.
A useful purchase description therefore states both the starting form and the delivery endpoint. “Rectangular stock for in-house key manufacture” leaves different responsibilities with the buyer than “finished parallel key to drawing.” Ask the supplier to identify any operation excluded from the quotation. Cutting, finishing and final inspection should each have an owner before the order is released.
Square key stock has equal nominal width and height; rectangular stock has different nominal width and height. The distinction helps identify the cross section, but neither term establishes the complete part. Length, tolerance, material condition and the shape of the ends still need definition. A photograph of a square bar cannot settle those requirements.
Straight, stepped, tapered and Woodruff keys belong to different catalog categories. Treat the required form as a drawing decision rather than selecting whichever item shares one visible dimension. A straight length of stock does not establish the curved geometry of a Woodruff key or the relationship between the levels of a stepped key.
For a replacement, identify the existing design before searching by material. Obtain the equipment part number, assembly drawing or an approved replacement specification when available. If the only reference is a removed key, record that limitation. The removed item may be worn, modified or unrelated to the latest equipment revision; it is evidence to investigate, not automatic authority for manufacture.
| What you need | What the order should identify | Decision still required |
|---|---|---|
| Stock for your own cutting operation | Cross section, stock length, material and supplied condition | Who makes and inspects the finished key? |
| Cut blank | Blank dimensions and expressly excluded finishing | Which features remain unfinished? |
| Finished straight key | Drawing revision, finished dimensions, ends and edges | What is the acceptance method? |
| Special key form | Complete geometry or approved part specification | Has the form been confirmed against both mating parts? |
Catalog phrases such as “keyway stock” or “key stock metal” can help locate a product category, but they make weak purchase specifications. Replace them with a concrete description of the ordered article. If two suppliers interpret the phrase differently, compare their written scope before comparing their prices. Otherwise, one offer may include finished parts while another covers raw stock.
Also separate a maintenance spare from a new design. A spare should follow the approved equipment configuration. A new connection needs an engineering decision about the complete assembly. Neither job is resolved by finding a stock bar that looks close to the existing groove. Purchasing should preserve that distinction rather than quietly becoming the design authority.
A key-stock size needs named dimensions, units and tolerances. Width, height and length are separate requirements; writing three numbers without identifying their order invites an avoidable misunderstanding. State whether those numbers describe purchased stock, a cut blank or the final key, and identify which document controls if a catalog description differs.
Use a dimensioned sketch when the supplier’s ordering convention is unfamiliar. Label width as b, height as h and length as L, or retain the symbols already used on the approved drawing. Symbols are useful only when their meaning is clear. Do not let a shorthand size replace the actual feature limits.
Keep inch and metric specifications explicit throughout the request. A converted nominal value does not, by itself, transfer the original tolerance, fit convention or key form. Ask engineering to approve any proposed substitution against the governing drawing. The supplier should quote the approved requirement rather than silently rounding a converted dimension to the nearest catalog size.
The table below selects six square-key rows from J&E Supply’s public inch reference. Read the lower shaft boundary as over and the upper boundary as through. These are nominal candidate sizes, not measured bar limits or a complete ASME table. Use the released drawing to approve the finished part.
| Shaft diameter over (in) | Through (in) | Nominal key width × height (in) |
|---|---|---|
| 7/16 | 9/16 | 1/8 × 1/8 |
| 9/16 | 7/8 | 3/16 × 3/16 |
| 7/8 | 1-1/4 | 1/4 × 1/4 |
| 1-3/8 | 1-3/4 | 3/8 × 3/8 |
| 1-3/4 | 2-1/4 | 1/2 × 1/2 |
| 2-1/4 | 2-3/4 | 5/8 × 5/8 |
For example, a nominal 1-inch shaft falls within the row over 7/8 through 1-1/4 inches, giving a 1/4 × 1/4-inch square-key candidate. This lookup does not supply its length, material, tolerance or allowable torque. A replacement still has to match the approved key and both mating grooves.
Ganter’s original DIN 6885 stainless parallel-key catalog lists the following cross sections and shaft-selection bands. The bands retain the catalog’s range notation. They are a limited product-catalog extract, not a complete DIN selection table or a statement of Eugene inventory. Use the governing drawing or standard for exact boundary and tolerance decisions.
| Catalog shaft band (mm) | Key width b (mm) | Key height h (mm) |
|---|---|---|
| 8…10 | 3 | 3 |
| 10…12 | 4 | 4 |
| 12…17 | 5 | 5 |
| 17…22 | 6 | 6 |
| 22…30 | 8 | 7 |
| 30…38 | 10 | 8 |
| 38…44 | 12 | 8 |
A hypothetical 20 mm shaft lies within the catalog’s 17…22 mm band, which lists a 6 × 6 mm cross section. That is a catalog lookup, not permission to substitute that key into any 20 mm assembly. The original design may specify another key form, length or connection arrangement.
Keep the two tables separate. Converting an inch dimension into millimeters expresses the same nominal dimension in another unit; it does not approve replacing an inch-series part with a nearby metric catalog item. Record the original units on the drawing and ask the responsible engineer to resolve any proposed substitution.
For a stock quotation, attach the selected cross section as a reference and identify the finished requirement separately. A supplier can then explain whether its offered bar meets the required limits or needs further preparation. Ask for actual offered limits rather than treating a nominal table entry as an inspection result.
ASME B17.1 addresses keys and keyseats, including size and tolerance relationships for parallel and taper keys. Its public scope limits the covered sizes and tolerances to single-key applications. It also expressly excludes key strength and steel analysis. A reference to B17.1 therefore does not establish that a selected key can carry a particular assembly load.
DIN 6885-1:2021-11 identifies requirements for parallel keys and keyways of the deep pattern, including dimensions, tolerances and mass. Its designation is not a declaration that every inch-series key is interchangeable with a metric one. Write the governing standard and edition where the drawing requires them, then resolve any conflict through the responsible design authority.
A supplier’s reference chart can help locate a candidate stock size, but the released drawing should settle acceptance. Record the exact table or standard reference used during selection so engineering can check it. Avoid combining a cross section from one reference with groove requirements from another unless that combination has been deliberately approved.
For existing equipment, keep the drawing revision attached to the purchase request. An old maintenance list may identify the right family but omit a later change to length or end form. If the buyer sends a current drawing and an older parts list together, mark their order of precedence. The supplier should not have to choose which document wins.
The same discipline applies to quantities and cutting allowances. State whether the quoted quantity means stock bars, cut blanks or finished acceptable pieces. Ask who plans the stock consumption and what delivered lengths are acceptable. A stock purchase and a finished-part purchase have different commercial units, so compare quotations on the same basis.

Keyway fit is an assembly question. Checking only the stock width leaves the key height, groove depths, end geometry and hub relationship unresolved. Build the inspection request around the shaft, key and hub together, even when different suppliers manufacture those parts. Each supplier needs the requirements that affect its contribution to the connection.
Terminology varies between drawings and catalogs. Some documents distinguish the shaft’s keyseat from the hub’s keyway; others use keyway more broadly. Identify the component and feature rather than relying on the word alone. “Shaft groove width” and “hub groove depth” tell the reviewer more than an isolated instruction to inspect the keyway.
For width, ask which limits apply to the finished key and to each mating groove. Then ask how the specified relationship will be verified. A catalog label such as standard, oversize or undersize describes a supplier category; it should not replace a drawing requirement or an agreed inspection result. Get the actual quoted limits in writing.
For height and depth, have engineering confirm how the key sits in the shaft and engages the hub. Do not infer the required relationship from cross-sectional width alone. The drawing review should identify the controlling surfaces and any specified clearance or seating requirement. Where that information is absent, record the question instead of inventing a universal fit rule.
For length, confirm the available groove length and the approved key end form. An overall length can be correct while an unreviewed end shape remains unsuitable for the drawing. Ask whether the supplied key is ready for the specified groove or whether another operation remains necessary. Treat edge treatment as its own requirement when the drawing calls it out.
Describe the assembly symptom and the measurement that supports it. “The key does not fit” can mean that it will not enter the shaft groove, that the hub will not pass over it, or that the assembled connection has unwanted movement. Those observations call for different checks. The worksheet below organizes a review without prescribing a machining repair.
| Observed condition | Features to compare | Question to resolve |
|---|---|---|
| Key will not enter the shaft groove | Key width, shaft-groove width, edges and identification | Are the actual parts within the specified limits? |
| Key enters the shaft but the hub will not assemble | Hub width/depth, key projection, end form and assembly alignment | Which interface prevents the intended assembly? |
| Key reaches an end before the required position | Key length, groove length and end geometry | Does the finished outline match the available groove? |
| Movement remains after assembly | Condition and dimensions of key, shaft and hub | Is this a part mismatch, damage or an unresolved design condition? |
| Nominal size matches but measurements differ | Units, actual feature limits and supplied condition | Was the order for stock or an accepted finished key? |
Measure the named feature, not just the easiest accessible surface. Keep the key’s width and height results separate, and identify the shaft and hub used in the trial. If the measurement method cannot establish the drawing requirement, record that limitation. An apparently successful hand assembly is not a substitute for the dimensional evidence the order requires.
Before removing material, confirm who owns the finishing operation and who approves the result. A purchased oversize bar intended for in-house preparation has a different acceptance endpoint from a finished key supplied to drawing. Record any approved rework against that endpoint. Do not let an unrecorded adjustment become the dimensional instruction for the next order.
If a removed key moves visibly in an existing connection, first document the condition of all mating components. A request for oversize stock may conceal an unresolved maintenance question. Ask the equipment owner or responsible engineer to determine whether the key, shaft, hub or several components require repair or replacement before selecting the purchased part.
A dimensional report is more useful here than an instruction to “make it tighter.” Identify where each measurement was taken, whether the component was cleaned, and which surfaces show damage. Keep observations separate from the proposed remedy. The person approving a repair needs to see the condition that prompted it, not just a supplier’s suggested stock size.
For an assembly trial, define the trial’s purpose. It might check whether the supplied key and specified mating parts assemble as intended. It does not automatically qualify torque capacity, fatigue performance or every operating condition. If a functional test is required, the responsible engineer should define its procedure and acceptance criteria separately.
Set an escalation rule before the first delivery: any unexplained mismatch between the key and either groove returns to drawing review. This prevents an operator’s improvised adjustment from becoming an undocumented production requirement. When an adjustment is approved, update the relevant drawing or work instruction so the next order starts from the same agreed configuration.
A material name alone does not fully define key stock. State the grade or material specification required by the drawing, the supplied condition and any required finish. Catalogs offer different material and finish options, but their presence in a catalog does not establish suitability for your connection. Keep the engineering selection separate from stock availability.
A request that says only “steel key stock” gives the supplier room to make assumptions. Ask what exact material is being quoted and whether supporting documentation is included. Where the drawing names a grade, require approval before substitution. A quotation should identify deviations clearly rather than burying them in a general statement that the stock is equivalent.
Terms such as stainless, hardened or plated should trigger a request for the precise specification and condition. They do not establish an assembly load rating by themselves. If the connection requires a hardness range, coating requirement or other controlled property, identify its source and acceptance method. Do not add a value simply because another supplier’s catalog uses it.
For exposure to moisture, cleaning chemicals or another specified environment, give engineering the actual application information. Ask for the approved material and surface condition rather than a broad promise of corrosion resistance. The purchaser’s role is to carry that approved requirement into the order and confirm what the supplier will deliver, not to infer lifetime from a generic material family.
For stock that will be cut or finished in-house, include the intended downstream work in the technical discussion. Ask whether the quoted condition matches that operation and what material documentation will follow the stock. Record any supplier qualification as a specific statement tied to the offered item. Avoid treating a catalog’s general description as a process approval.
Traceability should match the contract. If material certificates or lot identification are required, state the required documents and how they connect to the delivered stock or finished keys. Ask for an example document before ordering when its format matters. This is more precise than asking for “all certificates,” which leaves both the deliverable and its value unclear.
In the quotation comparison, give material condition its own line. An offer for stock in a different supplied condition is a different technical proposal even when the grade name matches. Record whether the price includes the specified condition and its required documentation. This makes the material difference visible without relying on a broad equivalence statement.
Inspect the item you actually ordered. A stock-bar receipt, a blank receipt and a finished-key receipt should not use an identical acceptance checklist. Agree which features the supplier completes and which checks remain with the buyer. Then make the inspection record match those responsibilities so an unfinished feature is not mistaken for an accepted finished one.
| Inspection question | Evidence to agree | Action if unclear |
|---|---|---|
| Is this the approved item? | Part or stock identifier and drawing revision | Hold unidentified or conflicting material |
| Does the supplied geometry meet requirements? | Named dimensions, applicable limits and measurement record | Clarify the controlling drawing feature |
| Is the material and condition correct? | Required identification and contract documents | Resolve the missing evidence before release |
| Are finishing operations complete? | Specified ends, edges and surface condition | Assign the unfinished operation explicitly |
| Can the result be traced? | Lot linkage and agreed report identification | Restore the connection between parts and records |
For a first order, request a report format before shipment if the documentation affects acceptance. Check that the report identifies the item, revision, lot and inspected features. A collection of measurements without their drawing references is difficult to evaluate. The reviewer should be able to connect each reported result to the requirement it is intended to satisfy.
Define how a discrepancy will be handled. Separate identification errors, missing documentation and dimensional nonconformities because they require different responses. Ask the supplier to describe the affected quantity and segregation status. Engineering approval of a deviation, when applicable, should be recorded against that specific case rather than becoming an informal change to future requirements.
If assembly verification is part of acceptance, specify the mating components and their revision. A successful trial with an unidentified hub does not resolve fit against a different production hub. Record which parts were used and what the trial was intended to establish. Keep that result alongside the dimensional evidence so later reviewers can understand its scope.
Use the first delivery to improve the order description, not to accumulate unwritten exceptions. If inspection discovers an ambiguous edge requirement or an omitted report field, resolve it and update the controlled instruction. The next order should carry that clarification explicitly. Repeated verbal explanations are a sign that the purchasing specification still needs work.
If purchased bars become several finished part numbers, plan how their identity survives the cutting operation. The original bar label may disappear when the stock is divided. Decide what record will connect the remaining stock, the work order and the finished pieces. Where lot evidence is contractually required, confirm that the chosen handling method preserves that connection.
For spare storage, separate similar-looking items whose approved specifications differ. Mark the stock or its container with the identifier used in the purchase and work instructions. A visible nominal size alone may not distinguish material condition or an approved substitution. The objective is to let maintenance retrieve the intended item without reconstructing an old quotation.
When returning unused stock to storage, retain its status. A length that has been identified and accepted should remain distinguishable from unverified material or an item awaiting disposition. If identification is lost, use the agreed verification route rather than attaching a convenient label. This is a purchasing and handling control, not a substitute for any required material testing.
These controls are especially useful when the buyer orders stock centrally but separate maintenance teams make the final keys. Assign the transfer of drawing revisions, material identity and acceptance records to named roles. The supplier’s delivery record starts that chain; it cannot describe undocumented changes made after receipt.
Consider this hypothetical maintenance request: “Supply metal key stock to match the old pulley key.” The buyer has a photograph of the removed part, an equipment parts list and a shaft drawing. The hub drawing is missing. This is enough to start a clarification, but it does not yet define an installation-ready replacement.
The buyer first asks whether maintenance wants raw stock or finished keys. Maintenance confirms that no finishing operation is planned after receipt. The request must therefore describe a finished part rather than a bar. This changes the quotation scope: the supplier must identify the final geometry and the inspection it includes.
The buyer then checks the documents. The equipment parts list points to an older revision than the shaft drawing. Instead of selecting whichever description appears more detailed, the buyer asks the equipment owner to confirm the controlling configuration. The photograph remains useful for identifying the component, but it is not used to derive acceptance dimensions.
Because the hub drawing is absent, the buyer records that gap and asks engineering how to establish the approved hub requirement. Engineering may recover the drawing or define an authorized inspection and repair path for the existing component. The buyer does not substitute a generic stock chart for that decision. Price requests remain provisional until the missing interface is resolved.
The recovered documents establish the key form and mating requirements. In this hypothetical case, the photograph suggested a rounded end, while the available purchasing note did not describe an end form. The revised request now identifies that feature directly. Its inspection line refers to the finished end geometry rather than asking the receiving team to interpret the photograph.
The revised request now asks for finished machine keys to an identified drawing revision. It includes the required material and condition, quantity of finished pieces, agreed documentation and inspection expectations. The buyer asks the supplier to state whether its offer conforms fully or contains listed deviations. The request is now comparable across suppliers because it defines the same delivered article.
The following handoff is an original purchasing framework, not a standard or a claim about an actual customer order. Its purpose is to make missing decisions visible before the quotation becomes a commitment.
| RFQ field | What to attach or state | Who confirms it |
|---|---|---|
| Delivered item | Stock, blank or finished key; quantity basis | Buyer and supplier |
| Design authority | Controlling drawing, revision and document precedence | Equipment owner or engineering |
| Mating features | Relevant shaft and hub requirements | Responsible engineer |
| Geometry | Named dimensions, units, tolerances and end form | Drawing owner |
| Material | Specification, supplied condition and approved finish | Engineering and supplier |
| Acceptance | Required inspections, report and lot identification | Quality and supplier |
| Exceptions | Specific deviations requiring written approval | Authorized technical reviewer |
When the quotations arrive, compare the exceptions before comparing the unit prices. One supplier may exclude final cutting, another may offer a different material condition, and another may omit the inspection report. Put those differences against the same RFQ fields. Resolve them in writing so the eventual purchase order describes the agreed result rather than preserving several conflicting offers.
Suppose one hypothetical offer covers stock cut to a blank length, while another covers the finished key with the required ends. Put both against the RFQ’s delivered-item field. For the blank offer, ask the buyer’s manufacturing team to identify the remaining work and its acceptance record. For the finished-key offer, confirm that the supplier’s report covers the final geometry.
Now compare packaging and quantity descriptions. A quoted bar count cannot be compared directly with a quoted number of finished acceptable keys. Ask the stock supplier to state the delivered bar lengths and the finished-part supplier to state the delivered piece quantity. Keep any internal stock-consumption estimate separate from the supplier’s commitment.
The buyer can then evaluate each complete route: what arrives, what work remains, who performs it and what record permits release. This example does not assign invented processing costs or predict savings. It makes the scope difference visible so the buyer can obtain actual prices for the missing work before selecting the offer.
For a broader assembly purchase, keep the related fasteners on separate specifications. Eugene’s verified product families include retaining rings, disc springs and washers, locating and spring pins, and spring-steel strip. The drawing-based OEM and ODM service page provides a route for discussing those related fastener requirements. A key-stock supply capability should be confirmed separately rather than assumed from the connection’s other components.
Possibly, but review each finished part before consolidating purchases. Shared cross section does not establish shared material condition, length, end form or acceptance requirements. Group parts only after the drawing owner confirms the common stock specification and the downstream operations. Keep each finished-part identity visible in the work instruction and inspection record.
Do not substitute one connection element for another based on appearance or diameter. Identify the function defined by the assembly drawing and obtain engineering approval for a design change. If the actual task concerns locating-pin dimensions rather than a keyed connection, the separate dowel pin sizes and fits guide addresses that purchasing question.
Obtain the offered dimensions and compare them with the required finished envelope. Ask whether the offer is for additional stock to be finished or for a different finished part. That distinction determines whether the price includes the work still needed. Route any actual design change through the shared drawing/deviation rule established above.
If the assembly’s bill of materials also calls for a separate shaft-retention ring, review the specified ring against Eugene’s DIN 471 external circlip product family. Keep that inquiry separate from the machine-key requirement. Sharing a shaft location does not make two different part functions interchangeable.