First article inspection, or FAI, checks whether a produced item meets the applicable design requirements before production release. A useful FAI connects the drawing revision, inspected sample, characteristic-by-characteristic results and supporting records. It gives the buyer evidence for a release decision. It does not, by itself, prove long-run process capability or satisfy a separate production part approval process requirement.
The central question is whether the inspected article conforms to the agreed design definition. This may include dimensions, geometry, material, hardness, finish and referenced specifications. Agree which requirements belong in the report and what evidence will demonstrate each one.
Plan FAI before samples are made. A supplier can then identify a characteristic needing a special method, clarification or external report before the sample arrives. Discovering that a critical requirement was omitted delays a decision even when the part looks correct.
The term does not impose one universal form on every industry. Where the order invokes an industry standard or customer procedure, use that requirement and its stated revision. Confirm any additional customer forms before quoting the inspection work.
Identify the controlling drawing, revision and referenced documents first. Give each characteristic a clear reference, often through a numbered or ballooned drawing, so a reviewer can move from a report entry back to the requirement without interpretation.
Resolve conflicting requirements before inspection. A CAD model, drawing note and purchase order may differ. Record the agreed priority or approved clarification rather than choosing whichever value is easiest to measure.
Separate dimensional measurements from other evidence. A material certificate supports a material requirement; it does not establish a diameter. A hardness report needs to identify the relevant item and method. Decide how each document will be connected to the sample and order.

A report should identify what was required, what was inspected and what was found. Include the characteristic reference, requirement and tolerance, actual result or evidence reference, inspection method and disposition. Add the sample identity and report revision so results cannot be detached from the item.
For geometry, a number alone may be insufficient. Identify the datum setup and evaluated feature. For a visual requirement, state the agreed evaluation basis. When inspecting several samples, associate results with their respective identities.
Distinguish a missing result from a failed result. Both need action, but they mean different things. A blank cell should not be interpreted as a passing characteristic or a requirement that someone else checked.
The release decision belongs to the agreed approval authority. Record the disposition against the specific part and drawing revision. If rejected, locate the nonconforming characteristics and define the correction and resubmission evidence required.
Conditional acceptance needs a boundary. Identify the accepted deviation, affected quantity or period, corrective action and authorizing person. An email saying the sample “looks fine” should not silently approve an unreported deviation.
Retain the accepted package with the production baseline. If the drawing or process changes, the buyer can decide what needs renewed inspection against an identifiable starting point. Approval without the supporting report makes that comparison harder and can leave the original acceptance scope unclear.
These activities answer different questions. FAI establishes conformance of the submitted article to its design scope. Routine production inspection checks parts under the ongoing control arrangement. PPAP addresses a broader production approval task, including evidence that manufacturing can meet requirements under production conditions.
Do not label a dimensional report a complete PPAP package unless it meets the customer’s requirements. Equally, a buyer may request FAI without automotive PPAP. State the required deliverable in the RFQ so cost, timing and responsibility can be considered.
Where the customer invokes AS9102 for aerospace first article inspection, confirm the edition, forms and scope with the customer. A general inspection guide does not establish supplier certification or acceptance under that standard.
Send the controlled drawing and identify features governing assembly: locating surfaces, geometric relationships, material condition and any removal feature. Request an inspection proposal before approving sample manufacture. Confirm sample identification and the documents that must accompany the submission.
Eugene’s drawing-based fastener service provides a route for discussing a sample requirement. Send the drawing and requested FAI scope; agree the report and acceptance process in the quotation. A catalog name alone cannot define a precision locating-part inspection. Ask the quotation to identify any requested evidence that requires separate arrangement.
SGS: first article inspection scope; AIAG: production part approval process purpose.